Loading...

News Detail

Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport.

Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport.

Date​៖ 20-June-2025 News

   From December 9 to December 13, 2024, the Aeronautical Meteorological Department (AMD), led by the department director and several technical officers, participated in training and conducted a Site Acceptance Test (SAT) on the D-ATIS (Digital Airport Terminal Information Service) system at Techo International Airport. The activity included participation of experts from Technosky, as well as teams from CAIC and Trust Global Service. The AMD team studied the user guide, system operation and technical specifications of the equipment (inspection and maintenance), performed tests on its functionality in accordance with the conditions and technical requirements with the planned standards.


Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 187
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 188
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 189
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 190
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 191
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 192
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 193
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 194
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 195
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 196
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 197
Training activities and conducting a SAT on the D-ATIS equipment at Techo International Airport. Image 198

Video

News

Date​៖ 16-July-2025

Quality Management Systems Standard (QMS) ISO9001:...

Date​៖ 16-July-2025

កិច្ចពិភាក្សាពីតម្រូវការប្រើប្រាស់ទិន្នន័យឧតុនិយក្...

Date​៖ 14-July-2025

Training course on “Meteorological Information for...

Date​៖ 14-July-2025

Training course of SIGMET/ANNEX 3/WAFS in China

Date​៖ 14-July-2025

Meteorological On-Job Training in China

Date​៖ 25-June-2025

Study visit and Factory Acceptance Test (FAT) acti...

Date​៖ 20-June-2025

Training activities and conducting a SAT on the D-...

Date​៖ 20-June-2025

Study visit and Factory Acceptance Test (FAT) acti...

Date​៖ 20-June-2025

Inspection of the site and installation of meteoro...

Date​៖ 19-June-2025

Training and Site Acceptance Test (SAT) activities...

Date​៖ 18-June-2025

The activities study and FAT about meteorological...

Date​៖ 19-May-2025

The delegation visited the Central Forecasting Off...

Date​៖ 25-June-2025

Training activities and conducting a SAT on the Hi...